View from the utility room (fridge has been moved temporarily)
Wednesday, January 28, 2009
Layer 1 of floor removed
Scott took Friday off work and finished taking down the upper cabinets and removing the first layer of flooring. To our dismay, there was more water damage than we anticipated. It now looks like we will have to replace all the subfloor and some of the trusses. He is nearly through helping his sister remodel her house, so he should be able to tear into the floor soon. He wants to be able to start and finish that part in a day or two. We do not want a gaping hole in our kitchen any longer than necessary. So far we are surviving on take-out, cereal, sandwiches, frozen dinners and bumming from family. I'm trying to throw some fruit in there when I can. Here are some pics of the kitchen as it is right now. Send some sympathy my way. Folks at work are donating KFC coupons!!
Where the refrigerator used to be - lot of damage.
Where the sink used to be - even more damage. 

View from the utility room (fridge has been moved temporarily)
View from the utility room (fridge has been moved temporarily)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment